Rating valuation
[edit] Purpose of a rating valuation
The aim of a valuation for rating is to find the annual rental value of a hereditament (property that can be inherited) at a particular time, in accordance with the definition of rateable value. Remember that you are trying to find a rental value, not a capital value, whichever method of valuation is used.
Four main methods of valuation for rating purposes are recognised by the courts and tribunals:
- Rental method (using direct or indirect rental evidence).
- Contractor’s method or test.
- Profits or accounts method.
- Statutory formulae.
Follow the links for detailed descriptions of the four methods
[edit] Choice of method
The choice of method is more limited than appears at first sight, because statute prescribes that certain hereditaments are to be valued by formula - mostly, although not exclusively, hereditaments which are in the central rating list. In those cases, once the formula has been laid down by Parliament, no other method may be used. However, formula rating is being phased out, and under the 2005 rating list there are relatively few hereditaments left that are valued by formula.
For other hereditaments one or more of the remaining three methods must be used: rental, contractor’s, profits/accounts.
Rating law requires the rental value of a hereditament to be found. Clearly, therefore the rental method is to be preferred over all other methods. However, this depends upon there being sufficient vital information to form a view.
It used to be thought that if direct rental evidence - that is, a rent on the hereditament itself - was available, no other method of valuation should be considered by the courts (Robinson Brothers (Brewers) Ltd v Durham County AC (1938)). However, in later cases (notably Baker Britt v Hampsher (VO) (1976)) the courts have stressed the need to compare the rent actually passing on the premises with other rents on comparable hereditaments or, where there are no other rents, other methods of valuation (Garton v Hunter (VO) (1968)).
Where other rents or methods of valuation are used, tribunals and courts will weigh each one in order to decide how much reliance should be placed on them having regard to the particular circumstances of the case. It may be necessary to do more than one valuation, using different methods.
The choice is left with the valuer to decide which method or combination of methods is best in the circumstances. The courts will not take kindly to the presentation of numerous valuations by different methods - they feel that it is up to the valuer to choose the most suitable method in relation to precedent, their experience and professional opinion. Nothing, however, should deter the valuer from exercising their judgement by comparing one method with others if they feels it will assist them.
Lord Denning MR in Garton v Hunter (VO) (1968) said: ‘Nowadays we do not confine ourselves to the best evidence. We admit all relevant evidence. The goodness or badness of it goes only to weight and not to admissibility.’
Therefore, when analysing rental evidence for use in a rating valuation, consider all the possible evidence, making adjustments where necessary rather than just discarding evidence because it is not a perfect fit with the rating hypothesis.
For more information see: Choice of method for rating valuation.
This article was created by --University College of Estate Management (UCEM) 17:06, 6 December 2012 (UTC)
[edit] Related articles on Designing Buildings Wiki
- Beneficial occupation.
- Case notes for rating valuation (Garton V Hunter).
- Choice of method for rating valuation.
- Contractor’s basis for rating valuation.
- Existing use value.
- Profits method of rating valuation.
- Rental method of rating valuation.
- Statutory formulae for rating valuation.
- What is a valuer?
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.